select a view


WORK AND EXHIBITION SPACE  [FOLDABLE]

10 – 2022


DATA


available time
2 weeks
materials
metal
wood

type 
group project
environment
Designacademy
OS–workshop Thomas Lommée

technique
modular and foldable connecting system
software
vectorworks


ABOUT


The acoustic of our university is comparable with a busy train station.
You enter this huge industrial hall without any room divison or possibility to get your private zone.
Together with Jihoon Bae and Marguerit Perianu we decided to build a modular working space, as well as a place to exhibit projects or processeses to others. 





The project took place in a 2 weeks OS-workshop by Thomas Lommeé:
 “OpenStructures (OS) is an open modular construction system that promotes circular material flows and facilitates re-use and repair.
OS allows to build things together at a moment in time, where anyone is connected to everyone and everything can be produced everywhere.
It links modularity to collaborative innovation and new decentralised production techniques and results in a more sustainably built environment.
OS unfolds through a continuously evolving exploration by a community of authors that test and evaluate its potential within the field of design, art and architecture.” [openstructures.net]


The foldable structure is:
– A room divider (sometimes we had two clases at the same time in one area)
– A soundproof wall
– foldable and through that really easy to tidy away or bring somewhere els
– spending privacy and a place to hide

We were surprised how frequently its used and people even come from other classes to our area to work there.







PROCESS










IN USE

                                                                                                                                                  



Mark